SDR compensation plan template

Most SDR plans pay per meeting booked, and within a quarter the calendar fills with meetings AEs did not want and prospects who never show. Paying on activity buys activity. This template pays on opportunities the AE accepts against written criteria and on pipeline that reaches a real stage, with a quality gate the SDR can see and a payout example that adds up to the cent.

By·LinkedIn·Editorial Lead·7 sections·PDF + CSV·Updated

Download it

Loading…

What you get

  • Plan basics for a monthly SDR plan: OTE, pay mix, measures, and payout timing
  • Written acceptance criteria that decide whether a meeting counts
  • A rate table derived from target incentive and quota, with an accelerator above 100%
  • A worked monthly payout from meetings held to dollars paid
  • A three-month ramp with guarantees and a pre-launch checklist

Who it's for

  • VPs of Sales and SDR managers designing or fixing an SDR plan
  • Comp admins who need the plan math to reconcile to payroll
  • RevOps leads defining what counts as an accepted opportunity

What's inside

7 sections, each listed with its own size. The first is previewed below; the remaining 6 come with the download, with blank rows ready to fill in.

SectionSizePreviewed
Plan basics7 fields to completeBelow
Quality gates: when an opportunity counts8-point checklistIn the download
Rates and accelerator6 columns, 3 worked example rowsIn the download
Worked monthly payout5 columns, 6 worked example rowsIn the download
Ramp schedule5 columns, 3 worked example rowsIn the download
Checking the math and the designGuidance notesIn the download
Before the plan goes out8-point checklistIn the download

Preview of section 1

Plan basics

Plan name and role
e.g. FY2027 Sales Development Representative Plan
Plan period and payout frequency
e.g. Feb 1, 2027 to Jan 31, 2028; measured and paid monthly
OTE
e.g. $90,000

How to use it

1. Write the acceptance criteria before the rates

Agree with AE leadership on what makes an opportunity acceptable: ICP fit, a confirmed problem, the right persona, and a held meeting. If the criteria are vague, every rate you set afterwards pays for arguments.

2. Pay monthly, measure monthly

SDRs work short cycles and turn over quickly. A quarterly plan asks a 22-year-old to wait three months to find out whether their work counted. Monthly quotas and monthly payouts keep the feedback loop as short as the job.

3. Give the AE a deadline to accept or reject

Set a window, such as 5 business days after the meeting, after which the opportunity is accepted by default. Without it, AEs sit on meetings and SDR pay depends on how organized someone else is.

4. Cap the pipeline measure, not the opportunity measure

Pipeline dollars are easy to inflate at stage 2. Cap that measure (the example uses 150%) and let the opportunity measure accelerate, because an extra accepted opportunity is harder to fake than an extra zero on an amount field.

5. Run last quarter's data through the plan

Before launch, pay last quarter's SDRs on paper under the new plan. If your best SDR would have earned less than an average one, the weights or the gates are wrong.

Frequently asked questions

How are SDRs typically compensated?

A base salary plus monthly variable pay tied to qualified meetings or accepted opportunities, often with a pipeline or closed-won component. Pay mixes around 60 / 40 or 70 / 30 base to variable are common starting points; set yours from the role's influence and your own data.

Should SDRs be paid on meetings booked or meetings held?

Neither on its own. Pay on opportunities that the AE accepts against written criteria after the meeting is held. Booked meetings reward calendar filling, and held meetings still include poor-fit prospects.

Should SDRs get commission on closed-won deals?

A small closed-won kicker helps SDRs care about quality, but it should not be the main measure. Deals close months after the SDR's work, often after the SDR has been promoted, and the outcome depends mostly on the AE.

How long should an SDR ramp be?

Two to three months is a common range for SDR ramp, with quota rising each month and a guarantee that shrinks. Measure your own time to first accepted opportunity and set the ramp from that.